Astrophysical Virtual Observatory

::: EsoInstrMatrix :::
# Sitemap  
  AVO TWiki system # Edit # Attach # Diffs # Printable # More # Changes # Register # Search

:::
Logged in as TWikiGuest

EUROVO FC

AVO
SWG
Management
Science
Standards
Technology
Reports&Minutes
Forum
Events
Contacts
Help

EGG

Main

Know

Test

TWiki

ESO Instrument Matrix

A matrix of ESO instruments assessing applicability for producing calibrated products for the new SAF.


Instrument Characterization Software Data volume  
Acronym Name Telescope Type Band FOV Resolution (physical) No. of detector pixels Calibration pipeline Data reduction package Status Raw frame (MB) Calib'd data product (MB) Avg. data production (MB/day) Tot. archived data (GB) Approx. priority
Operational Instruments
Paranal
FLAMES-GIRAFFE Fibre Large Array Multi-Element Spectrograph, The GIRAFFE Spectrograph UT2 spectroscopy 370-900 nm 25' diameter R = 7500 - 30000 2k x 4k DFS CPL operational since June 2004, but still to be considered in development state 17.4 << 457 318  
FLAMES-UVES UV-Visual Echelle Spectrograph; Fibre Mode (Red Arm) UT2 spectroscopy 420-680 nm, 760-960 nm 25' diameter R = 47000, 1" Aperture mosaic of 2 x 2k x 4k DFS MIDAS (FLAMES context) pipeline phased in during Period 71 see UVES o
FORS1 FOcal Reducer/low dispersion Spectrograph UT2 (since June 05, 2004) imaging, spectroscopy, polarimetry 330 - 1100 nm 6.8' x 6.8' (max) 0".1 - 0".2 (spatially), R = 200 - 2500 (1" slit width) 2k x 2k DFS, EIS/MVM MIDAS, EIS/MVM operational ~9 ~18 617 1574 +
FORS2 FOcal Reducer/low dispersion Spectrograph UT1 (since June 05, 2004) imaging, spectroscopy, polarimetry 330 - 1100 nm 6.8' x 6.8' (max) 0".0625 - 0".125 (spatially), R = 200 - 2500 (1" slit width) mosaic of 2 x 2k x 4k DFS, EIS/MVM MIDAS, EIS/MVM MXU and HIT modes are presently not supported ~35 ~70 1113 1399 +
ISAAC Infrared Spectrometer And Array Camera UT1 IR imaging, spectroscopy, polarimetry 1 - 5 µm 2.5' x 2.5' (max) R ~500 or ~3000, spatially 0".1484 (2.5' x 2.5') 1k x 1k DFS, EIS/MVM eclipse (CPL planned), EIS/MVM operational (but tricky) ~44 ~4 1004 1851 o
MIDI MID-infrared Instrument for the VLT Interferometer VLTI Interferometry 8 - 13 µm 2" diameter 18 - 57 mas (nominal) 320 x 240 DFS CPL development state     3304 1936 -
NACO (NAOS-CONICA) Nasmyth Adaptive Optics System, Near-Infrared Imager and Spectrograph UT4 imaging, polarimetry, spectroscopy 1 - 5 µm 56" x 56" (max) 13 - 54 mas (spatially), R = 400 - 1500 1k x 1k DFS eclipse stable ~44 ~4 916 680 -
UVES UV-Visual Echelle Spectrograph UT2 spectroscopy 300-500 nm (blue) and 420-1100 nm (red) -- R ~ 40000 (1" slit) 2048 x 3000 (blue), mosaic of 2 x 2k x 4k (red) DFS MIDAS (UVES context) stable 34.4 << 3112 4290 o
VIMOS VIsible Multi Object Spectrograph UT3 multi-object spectroscopy 0.37 - 1.0 µm 14' x 16' R = 200, ~600, ~2000 (1" slits); 0".205 (spatially) mosaic of 4 x 2k x 4k DFS CPL Pipeline has been released to the public by DMD (May 2004); stable, but instrument is not! ~71 << 6567 4232 +
La Silla
EFOSC2 ESO Faint Object Spectrograph and Camera 3.6m imaging, spectroscopy 355 - 850 nm 5.2' x 5.2' 0".157 2k x 2k       ~9 ~18 414 234  
TIMMI2 Thermal Infrared Multimode Instrument 3.6m imaging, spectroscopy, polarimetry 3 - 25 µm 100" x 76" (max) 0".2 - 0".6" (spatially), R = 130, 160 320 x 240           298 599  
CES Coude Echelle Spectrometer 3.6m spectroscopy 346 - 1028 nm -- R = 235000 (max) 2k x 4k       ~18 << 189 55  
HARPS High Accuracy Radial velocity Planet Searcher 3.6m spectroscopy 378-691 nm -- R = 120000; radial velocity accuracy of 1 m/s 2 x 4k x 4k     First Light: February 11, 2003 ~71   613 1232  
SOFI Son of Isaac NTT IR imaging, spectroscopy, polarimetry 0.9 - 2.5 µm 4.9' x 4.9' (max) spatially 0".144, 0".276 and 0".288, R = 600 or 1500 1k x 1k EIS/MVM EIS/MVM   ~44 ~4 203 770 o
SUSI2 Superb Seeing Imager 2 NTT imaging 357 - 850 nm 5.5' x 5.5' 0".08 mosaic of 2 x 2k x 4k EIS/MVM EIS/MVM commissioned February 1998 35.2 (max) ~70 168 637  
EMMI ESO Multi-Mode Instrument NTT imaging, spectroscopy 300 - 1000 nm 9.1' x 9.9' (max) 0".13 - 0".37, R = 280 - 70000 mosaic of 2 x 2k x 4k, 1k x 1k       ~35 ~70 454 1723  
FEROS FEROS on the MPG/ESO-2.20m Telescope 2.2-m MPG/ESO high-resolution spectroscopy 350 - 920 nm ca. 5.0' x 3.6' R = 48000 2k x 4k     2002-Oct-24: First Light ~18 << 486 2370  
WFI Wide Field Imager 2.2-m MPG/ESO imaging 340 - 965 nm 34' x 33' 0".238 mosaic of 8 x 2k x 4k EIS/MVM EIS/MVM   142 280 9818 22778 +
Future Instruments
CRIRES High-Resolution IR Echelle Spectrometer UT1 IR spectroscopy 1 - 5 µm -- R >= 100000       final instrument design          
AMBER Astronomical Multi BEam combineR VLTI interferometry 1 - 2.5 µm -- 1 mas, R = 10000 (max)       should be open to the ESO astronomical community for period P75          
HAWK-I High Acuity Wide field K-band Imager UT4 NIR imaging 0.85 - 2.5 µm 7.5 x 7.5 arcmin 0".1063 Mosaic of 4 x 2k x 2k     Instrument approved - Preliminary Design Review in March 2004          
OmegaCAM   VST imaging 330 - 1000 nm 1° x 1° 0".21 16k x 16k mosaic     1st light will take place in Q1/2005          
PRIMA Phase-Referenced Imaging and Micro-arcsecond Astrometry VLTI interferometry, astrometry 1 - 10 µm 2" lambda/1000 at 2 µm; 1 mas at 2.2 µm n/a     instrument in development stage          
SINFONI (SPIFFY) Spectrograph for INtegral Field Observations in the Near Infrared UT4 spectroscopy 1.1 - 2.45 µm 8" x 8" (max) R = 1000 - 3300 1k x 1k     First Light: July 2004; in commissioning          
VINCI VLT INterferometer Commissionning Instrument VLTI interferometry             commissioning     148 128  
VISIR VLT Imager and Spectrometer for mid Infra Red UT3 imaging, long-slit spectroscopy 8-13 and 17-24 µm 51".2 x 51".2 (max) 0".075, 0".127, 0".2 2 arrays of 256 x 256     commissioning     ~16 180  

Remarks:
Spatial resolution refers to the pixel scale.

R = spectral resolution (resolving power)

(~) Raw frame size and calibrated data product size estimated

Average compression rate (2x) assumed

Average daily data production from P70, P71, P72, P73 until Jun'04 (incl.), i.e. Oct'02 - Jun'04 (rows 62 - 82)

DFS FORS imaging pipeline: provides photometric zero points but does not provide astrometric calibration, photometric calibration, source catalogs

EIS/MVM = imaging pipeline


References:

Instrument specifications: http://www.eso.org/instruments/ http://www.ls.eso.org/lasilla/sciops/ http://g4-fluor.obspm.fr/vinci/index.html (does not respond)

Archived data (volumes/rates): AndreasWicenec

DFO Pipelines: http://www.eso.org/observing/dfo/quality/pipeline-status.html

Contact: Reinhard Hanuschik

EIS/MVM pipeline: http://www.eso.org/science/eis/software/


-- JoergRetzlaff - 11 Aug 2004


# Edit menu  


Topic revision r1.11 - 08 Oct 2004 - 07:34 - MarcoLeoni Copyright © 2003 by the contributing authors. All material on this collaboration tool is the property of the contributing authors. Ideas, requests, problems regarding AVO TWiki ? Send feedback.