AVO Technology
New Reports
(1) draft of third year report :
AVO-WA3-year3-report-draft.htm:
(2) final network report
AVO-WA3-network-report-2.pdf:
Formal Reports from Work Area Three
Key formal reports produced by WA3 are linked here. Other informal documents and so on are under "WA3 sub-topics" below.
AVO-WA3-year1-report.htm: First Annual Report, November 2002.
AVO-WA3-year2-report.htm:
Second Annual Report, January 2004.
AVO-WA3-network-report-1.doc: This report (December 2002) proposes a set of benchmarking tests to evaluate the performance of Grid middlware components over the network.
AVO-WA3-middleware-report.doc: This report (Jan 2004) summarises our experience to date evaluating and deploying web services and grid middleware, and sets out a list of reccomendations for the future Euro-VO.
AVO-WA3-datamining-report.doc: This report (Jan 2004) summarises our experience to date evaluating and deploying database management systems and related techologies, and sets out a list of reccomendations for the future Euro-VO. This report is also available in PDF format.
AVO-WA3-network-report-2.pdf:
This report (Feb 2005) summarises and analyses general network issues of relevance to the Virtual Observatory, reports and analyses measurements of bandwidth between AVO partner sites, and sets out recommendations for investment in network infrastructure. A slightly earlier version of the report (Jan 2005) is also availalable. Finally, there is a subsequent report (not produced as part of the AVO Project) which includes expanded tutorial material, but has had the sections specific to the Virtual Observatory removed.
VO-TECH Proposal
The AVO programme is building towards the idea of a European Virtual Observatory (Euro-VO), which we see as composed of three parts - VO facility Centre (VOFC), Data Centre Alliance (DCA), and VO technology Centre (VOTC). The latter can be seen as the successor to the AVO-WA3 programme. AstroGrid, ESO, CDS, and INAF recently submitted an FP6 proposal to fund the VOTC programme for 2005-2008.
VO-TECH-proposal.pdf: Proposal to the EC under FP6, March 2004.
WA3 Sub topics
Work Programme for Work Area 3
Here is the list of our committed deliverables.
Their status is discussed in the January report, and in the sub-package work programme pages.
- 3.1.1 Benchmark network tasks (Nov 2002)
- 3.1.2 Middleware assessment report and recommendations (Nov 2003)
- 3.1.3 Network analysis report (Nov 2003)
- 3.1.4 Demonstration of working datagrid (Nov 2003 : joint with other WAs)
- 3.2.1 Deploy trial hardware (Nov 2002)
- 3.2.2 Storage assessment report and recommendations (Nov 2003)
- 3.2.3 Architecture assessment report (May 2004)
- 3.3.1 Benchmark datamining tasks (Nov 2002)
- 3.3.2 DBMS assessment report and reccomendations (May 2003)
- 3.3.3 Working datamining system for external user testing (Nov 2003 : joint with other WAs)
These are the priorities for 2004 :
- Jan : WA3 annual report
- Feb : hardware assessment report
- March : VOTC proposal
- April : network analysis report
- July : architecture report
- November : final report
|
|